This picture gallery shows a full refurbishment of a private house, owner was denied building permission to knock down and rebuild.

Subsequent construction work has been carried out:

  • Complete decoring down to the loadbearing walls
  • Demotilition of the basement foundation
  • Excavating under the strip foundation to archive higher basement height after foundation insulation
  • Removal of old electric, plumbing and heating
  • Removal of old staircase including metal construction
  • Suspended drywall ceiling with ceiling heating/solar powered cooling
  • Installation new electrics (SMARTHOME LOXONE)
  • Installation of new windows and front door (bulletproof for burglary protection)
  • Installation of an alarm-system
  • installation of solar system for warm water and electricity
  • Installation new internal doors
  • All walls and ceilings done with real venetian plaster
  • Staircase and bedroom wall done with marble-like venetian plaster
  • Installation of new V2A staircase inclusive solid oak steps
  • Installation of 2 new Design bathrooms
  • Installation of 140cm x 200cm bathtub
  • Installation wheelchair accesable showers
  • Supply and fit custom wardrobes, beds and furniture
  • Epoxyreinforced screed + selfleveling compound
  • Supply and fit of 200m² solid oak heringbone parquet with oiled finish
  • Paintwork in technical room (heating)
  • Gardendesign with decking and gabions
  • and much, much more….